Loading..

Cliffs Haven

20 One bedroom apartments located in Lekki, Lagos.

Construction time was 8 months.

Ogidi Haven

Apartment building located in Lekki, Lagos.

Construction time was 12 weeks.

THN LEKKI SERVICED OFFICE

Office Building project located in Lekki, Lagos state.
Building type: A storey building which consists of 9nos of 40ft containers stacked to give 2 floors of six offices.
Construction time was 10 weeks.

CORONA ADMINISTRATIVE OFFICE

Admin office building project located in Mekunwe, Ikoyi, Lagos state, Nigeria.
Building type: An office building which consists of THN portacabin building
Construction time was 10 weeks.

GTB, UBA, ECOBANK, STANBIC IBTC AND ACCESS BANK ATM UNITS.

ATM units deployed across Nigeria.
Building type: Single, double and triple ATM Units. THN is fabricated ATM kiosks for the above listed banks in selected locations across Nigeria.

Construction time was 7 working days for each unit.

STERLING BANK

Sterling Bank Branch project located in LASU, Lagos state.
Building type: Modification of four of 40ft containers into a bank branch office.

Construction time was 4 months.

UNION BANK BRANCH KANO.

Union Bank Branch project located in Kano, Nigeria.
Building type: Modification 6 x 40ft containers in a storey building for Bank branch purpose

Construction time was 20 weeks.

ENERGY TRAINING CENTRES

Solar powered Energy Training centres located in KANO,WARRI,AKWA, SOKOTO, Nigeria.

Building type: Steel and sandwich panels consisting of the erection of 429sqm floor area steel structure covered with sandwich panels.

Construction time was 18 months for 4 sites.

LIFESTORES PHARMACY

Lifestores pharmacy popup store located in Lagos, Nigeria.

Building type: 1 x 40ft Containers

Construction time was 2 weeks.

RUSHING TAP STUDIOS

Shooting studios and administrative building located in Lagos, Nigeria.

Building type: Cargotecture, steel and block work.

Construction time was 16 weeks.

ICT TRAINING CENTER, KWARA STATE

ICT training center located in Kwara state.

Building type: 1 x 40ft Containers

Construction time was 3 weeks.

COVID TESTING LABS

Covid Rapid Deploy Testing Labs for 54Gene, Medbury, Acouns and Clina Lancet Nationwide

Construction time was 7 days per location

BIGGS

Biggs Express Stores
Building type: 20ft container modification.
construction time was 12 days per location.

pinnacle

Pinnacle Communications Centre.
Building type: 40ft containers.
Construction time was 3 weeks.

lily hospital

Lily Hospital Day Clinic.
Building type: Sandwich Panel.

Construction time was 12 weeks.

Harlequin

Harlequin Drone Command Centre located in Kano state, Nigeria.

Building type: A mixture of cargotecture and wet construction.

Construction took 16 weeks build time.